BECL Logo
Brochure ↓
BECL Insignia BECL
+
+
+
+
BECL Architectural Engineering Elevation
Pre-Stressed Concrete Girder Structure
12-Fl Seismic Resilient Foundation
High-Precision Structural Facade & Core

Bhawal Engineers & Construction Ltd.

Disrupting infrastructure development with specialized precision. Delivering national-scale public sector civil engineering, river bank protection, multi-span bridges, highways, and high-rise institutional facilities across Bangladesh.

0
Quality & HSE Safety Compliance
Audited Government Standards
0
Mega Projects Completed
Highways, Bridges, Dredging
0
Owned Heavy Equipment
Dredgers, Pavers, Compactors
0
Years Engineering Excellence
Highest Taxpayer Accolade
BECL High-Rise Engineering Vision

ENGINEERING EXCELLENCE GROUNDED IN DISCIPLINE & TECHNOLOGY. DELIVERING PRECISION HIGHWAYS, BRIDGES & MARINE INFRASTRUCTURE ACROSS BANGLADESH.

Backed by owned heavy dredgers, automated asphalt mixing plants, disciplined project sequencing, and audited HSE engineering standards for national development.

OUR CORE TEAM
CHAIRMAN

Taslima Akhter

Board Governance & Strategic Vision
📞 01717-898488 • Mymensingh HQ
MANAGING DIRECTOR

Farah Pritha

Joint Ventures & Mega Procurement
Banani Corporate HQ, Dhaka
EXECUTIVE DIRECTOR

Maj. Md. Monirul Islam (Retd.)

Operations Execution & Quality Control
📞 01711-265859 • Technical Ops
PROJECT LEAD

Engr. Md. Farhad Hossain

Highway Paving & Bridge Structures
RHD & LGED Highway Networks
MARINE COMMAND

Marine Operations Wing

Capital Dredging & River Slope Revetment
BWDB & RRI Strategic Liaison
HSE & QA/QC

Materials & Standards Lab

Audited Concrete Strength & Seismic QA
Central QA/QC Testing Division
WORKS NATIVELY WITH BWDB, RHD, PWD, LGED & EED // CLASS-1 EPC CONTRACTOR // BANANI & MYMENSINGH

Specialized Engineering Capabilities

Delivering turnkey infrastructure solutions across five critical national developmental corridors.

🌊

River Bank Protection & Capital Dredging

Specialized marine works under the Bangladesh Water Development Board (BWDB) and River Research Institute (RRI).

  • Underwater slope geotextile bag dumping
  • Jamuna, Brahmaputra & Kangsha river revetment
  • Large-scale capital channel re-excavation
  • Dampara & Haor Flood Management schemes
🌉

Bridges, Flyovers & Culverts

High-load highway structural engineering executing pre-stressed concrete girder bridges and multi-vent culverts.

  • 5 Nos PC/RCC Bridges on Jamalpur-Rowmari (Z-4606 Corridor)
  • 4-Lane Bridge on Feni-Noakhali Highway (N-104)
  • 7 Nos RCC Box Culverts on Kishorganj corridors
  • Deep bored piling and pier foundation casting
🛣️

Highways & Regional Road Networks

National road modernization under Roads and Highways Department (RHD) and LGED.

  • Dense bituminous surfacing & sub-base compaction
  • Netrokona-Kendua Road Highway (Z-3706 National Grade)
  • Bogura Banani-Matidali Highway Surfacing (Bituminous Heavy Corridor)
  • Owned Ammann Apollo asphalt batching plants
🏢

High-Rise & Institutional Complexes

Multi-storied civic and judicial structures engineered for PWD, EED, and Ministry of Housing.

  • Kishoreganj Chief Judicial Court (Multistory Seismic Civic Structure)
  • Netrokona 6-Storied Hospital with 12-Fl Foundation
  • Technical Training Centre (TTC) at Nagarpur, Tangail
  • Full seismic resilience and electromechanical integration
🎓

Academic & Research University Facilities

State-of-the-art educational infrastructure built for premier public universities in Bangladesh.

  • JKKNIU Student Halls (North & South Blocks - 10-Fl High Rise)
  • MBSTU Tangail Senior Teachers & Officers Quarters
  • Auditoriums, testing laboratories & modern campuses
  • Full interior finishing and civil landscaping
🛡️

HSE & Geotechnical Quality Standards

Rigorous zero-harm safety culture and certified testing protocols deployed on every project.

  • Certified on-site material testing laboratories
  • Full personal protective equipment (PPE) enforcement
  • Method statement & CPM scheduling coordination
  • 100% on-time milestone delivery track record
WHAT'S AROUND NATIONWIDE INFRASTRUCTURE FOOTPRINT
↳
Chauhali 8.00 km Underwater Protection 8.0 km Geobags • Jamuna Basin • BWDB
↳
Andanga Khal Re-Excavation & Revetment 2.2 km Channel Works • BWDB Jashore
↳
Netrokona-Kendua Highway (Z-3706) 24.5 km Corridor • RHD Netrokona
↳
Jamalpur-Rowmari 5 Major Bridges 5 PC Girder Bridges • RHD Jamalpur
↳
Kishoreganj CJM Court Building 6-Fl Court • 12-Fl Deep Pile • PWD
↳
Netrokona 6-Storied Modern Hospital Specialized Medical Complex • PWD
↳
JKKNIU Multi-Storied Student Halls Twin 10-Fl Blocks • Trishal Campus
↳
Nagarpur Technical Training Centre (TTC) Vocational Complex • PWD • Tangail
☩ Drag to navigate map
JAMUNA • BRAHMAPUTRA RIVER WATERWAY // UNDERWATER GEOTEXTILE REVETMENT ZONE ANDANGA BASIN CHANNEL RE-EXCAVATION // BWDB JASHORE RHD NATIONAL CORRIDOR // Z-3706 REGIONAL CONNECTIVITY AXIS // Z-4606 CENTRAL TRANS-DIVISION EXPRESSWAY CIVIC & JUDICIAL MASTERPLAN ZONE REGIONAL HEALTHCARE HUB JKKNIU CAMPUS RESIDENTIAL PRECINCT
Chauhali 8km Protection
Andanga Khal Basin
Netrokona-Kendua Highway
Jamalpur 5 Major Bridges
Kishoreganj CJM Court
Netrokona Modern Hospital
JKKNIU University Halls
Nagarpur TTC Campus
Project Preview

Ongoing Works Live Progress Tracker

Real-time status of active national infrastructure contracts currently under execution.

BWDB JASHORE [01]
Hatirjheel Riverfront & Bridge Architecture
ACTIVE EXCAVATION CH 0+500 – 2+700

Andanga Khal Re-Excavation & Bank Protection

Re-excavation from km 0.500 to km 2.700 (2.200 km) and slope protection alongside 2 outlet rehabilitations in Chitra-Bhairab-Afra Sub-Project.

Execution Milestone 68% Completed
LGED MYMENSINGH [02]
Urban Architectural Infrastructure
DRAINAGE & CULVERTS 10 URBAN LOCATIONS

Gafargaon Pourashava Roads, Drainage & Culverts

6,542m roads in 10 locations, 3,962m RCC drains, 537m palisading, 16 road cross drains, 187 street lights, and single-vent RCC box culverts.

Execution Milestone 75% Completed
RHD BOGURA [03]
Padma Multipurpose Bridge & Highway Corridor
HIGHWAY SURFACING N-514 // 8.67 KM

Banani-Matidali National Highway (N-514) Surfacing

Emergency periodic maintenance from km 0+000 to 8+670, bituminous layer scarifying, dense recompaction, and modern asphalt surfacing under Bogura Division.

Execution Milestone 82% Completed
BWDB NETROKONA [04]
Dhaka Modern High-Rise Civic Architecture
RIVER REVETMENT KM 49.990 – 50.990

Kangsha River Bank Protection (Twin Packages)

Protection along right bank of Kangsha River (1.00 km) protecting Monsur Ahmed Women's College, Ispinjapur and Gopalpur Bazar commercial centers.

Execution Milestone 60% Completed
RHD JAMALPUR [05]
Megacity Architectural Skyline & Infrastructure
PC GIRDER BRIDGES Z-4606 CORRIDOR

Jamalpur-Rowmari 5 Major PC Girder Bridges

Pre-stressed girder bridges spanning critical river networks with deep bored pile substructures and high-load approach embankments.

Execution Milestone 88% Completed

Owned Heavy Equipment Fleet

BECL owns an extensive inventory of specialized construction machinery (Brochure P.63–78), guaranteeing rapid mobilization for high-value tenders.

BECL / HEAVY ARSENAL
☩ DRAG OR CLICK CARDS TO EXPLORE
ISO 9001:2015 CERTIFIED FLEET
01 / 08

Caterpillar Bulldozer D8T

333 HP Maximum Net Power • 39,795 kg Operating Wt • 22.7in Digging Depth

01

Valued Government & Autonomous Clients

BECL is pre-qualified and actively executing mega tenders across key ministries of the Government of the People's Republic of Bangladesh.

BWDB Official Logo

BWDB

Bangladesh Water Development Board

RHD Official Logo

RHD

Roads and Highways Department

PWD Official Logo

PWD

Public Works Department

LGED Official Logo

LGED

Local Government Engineering Dept.

EED Official Logo

EED

Education Engineering Department

RRI Official Logo

RRI

River Research Institute

JKKNIU Official Logo

JKKNIU

Jatiya Kabi Kazi Nazrul Islam University

NBR Official Seal

NBR

Highest Taxpayer Award Recipient

Resource Mobilization & Procurement Curve

Empirical 12-month tender execution cycle (Brochure p.58-62) correlating monthly skilled workforce deployment against capital materials expenditure and structured quality assurance governance.

ANNUAL WORKFORCE DEPLOYMENT TREND COMPARED TO PROCUREMENT ALLOCATION
FIGURE 04 // BECL NATIONAL INFRASTRUCTURE CONTRACT CADENCE
WORKERS MOBILIZATION (PEAK 200 PERSONNEL)
MATERIALS PURCHASE % (100% CAPITAL ALLOCATION)
● HOVER OR SCRUB ACROSS GRAPH TO AUDIT DETAILS
◈ ACTIVE STAGE AUDIT
APRIL: Peak Sourcing Advance
High-volume aggregate, bitumen VG-30 and rebar mill deliveries before monsoon.
SKILLED WORKFORCE
160 Specialists
Daily Average on Active Sites
PURCHASE ALLOCATION
15.0% Capital
Peak Single-Month Procurement
CUMULATIVE SOURCING
50.0% Executed
Half of Total Project Sourcing
250 W 20% 200 W 16% 150 W 12% 100 W 8% 50 W 4% 0 0% DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV INITIAL SETUP [50] FOUNDATION PILING [150] PEAK MOBILIZATION: 200 PERSONNEL ASPHALT SURFACING [175] QC & HANDOVER [100] PEAK SOURCING: 15%
PEAK SITE WORKFORCE
200 Specialists
June–July Structural Surge
MAX CAPITAL SOURCING
15.0% In April
Advance Pre-Monsoon Stock
CUMULATIVE ALLOCATION
100% Completed
Balanced 12-Month Cadence
GOVERNANCE PROTOCOL
6-Tier Standard
ISO 9001:2015 / PWD Vetted
MONTHLY CAPITAL EXPENDITURE INTENSITY // PROPORTIONAL SOURCING VOLUME
CLICK ANY MONTH TO AUDIT PHASE DETAILS
10%
DEC
50 W
5%
JAN
80 W
7%
FEB
120 W
13%
MAR
150 W
15%
APR
160 W
8%
MAY
180 W
10%
JUN
200 W
10%
JUL
200 W
5%
AUG
180 W
7%
SEP
175 W
4%
OCT
120 W
6%
NOV
100 W
MATERIALS PURCHASE PLAN // 6-STAGE QUALITY ASSURANCE PROTOCOL
BROCHURE P.60 // INTEGRATED SUPPLY CHAIN MANAGEMENT
[01] PROTOCOL
Make Procurement List
Tender BOQ translation into itemized raw materials schedule.
[02] PROTOCOL
Set Specification & Criteria
AASHTO, BSTI & PWD grade compliance benchmarking.
[03] PROTOCOL
Sample Approval
Third-party laboratory testing at BUET, RRI & LGED labs.
[04] PROTOCOL
Deal with Vendor
Direct corporate mill agreements ensuring guaranteed delivery.
[05] PROTOCOL
Identifying Risks & Risk Mgmt
Buffer stock protocols mitigating price surges & monsoon supply.
[06] PROTOCOL
Stock and Deliver
On-site moisture-controlled silos & just-in-time deployment.

Project Consultation & Preliminary Estimator

Select your infrastructure classification to review estimated timeframes and mobilization requirements.

Indicative Project Scope

Our algorithm provides preliminary mobilization metrics based on BECL's audited public contracts:

Client Directorate Alignment

BWDB / Marine Works Division

Standard Execution Timeline

12 Months

Dedicated Machinery Mobilization

Cutter Suction Dredger, Geo-bag Revetment units, Tug Boats

★ BECL Executive Commitment

All formal inquiries receive direct review from Farah Pritha (Managing Director) and the Chief Technical Advisory Board.